MASSPOINT Hybrid BESS Supports Tower Crane Load at Construction Site
Construction Site Achieves Zero-Emission Crane Operation with MASSPOINT Hybird BESS
In a recent power supply project for a construction site, the main load came from a tower crane. Traditionally, the site relied on a 400 kVA diesel generator set for continuous power. However, the load profile—characterized by high peak demand and very low average load—posed significant challenges, forcing the generator to operate for extended periods at low load. This resulted in poor fuel efficiency, excessive diesel consumption, increased wear and tear, and high levels of noise and carbon emissions.

🔧 The Challenge: Mismatched Load and Power Supply
🛠 The MASSPOINT Solution: Hybrid Energy Storage Reshapes the Power Architecture
☁️ Smart Cloud Platform Enables Unattended Operation
Beyond the hardware system, the MASSPOINT intelligent cloud platform provides remote monitoring, control, and diagnostic capabilities, facilitating truly smart and unattended site power management.
📈 Project Impact and Industry Insight
This case clearly demonstrates how the MASSPOINT Hybrid BESS supports construction sites in transitioning toward a greener, quieter, and more economically efficient power future. In applications with highly fluctuating loads, stringent noise requirements, and high energy cost sensitivity, the system not only enhances energy utilization efficiency but also drives the sustainable transformation of construction operations.