›⌄Q1: How to design a battery energy storage system?
›⌄A:
1. Define Application & Goals: Backup duration? Peak shaving? Energy arbitrage? Renewable integration?
2. Analyze Load Profile: Understand energy (kWh) and power (kW) requirements over time.
3. Size the System:
1)Energy Capacity (kWh): Determines how much energy can be stored/discharged. Based on required backup duration or daily cycling needs
2)Power Rating (kW): Determines how fast energy can be delivered/absorbed. Based on peak load demand or grid service requirements.
3)Safety & Compliance: Ensure design meets all local electrical codes, fire safety standards, and environmental regulations.
Q2: How do I charge the BESS?
›⌄Q3: How long does it take to install the BESS?
›⌄Q4: What kind of batteries do you use?
›⌄Q5: What maintenance does the BESS need?
›⌄A: The BESS has very few moving parts so maintenance is much simpler than a diesel generator. At a minimum, and included in our maintenance plan, we recommend a maintenance check every 6 months. The BESS is also internet connected so our team monitors the performance of the unit in realtime and can flag any unusual behaviour before it affects the operation of the unit.
For more information, please e-mail us on contact. We’re excited to hear from you!
Q6: Is there any warranty for the BESS? How long does it last?
›⌄